Quick Details

  • Condition: New
  • Application: rigid pp pe products
  • Automatic Grade: Automatic
  • Production Capacity: 300 KG/H
  • Place of Origin: Jiangsu, China (Mainland)
  • Brand Name: BRIGHTER
  • Model Number: SC300
  • Voltage: Customer Standard
  • Power(W): 120KW
  • Dimension(L*W*H): 60M*3.5M*4.5M
  • Weight: 8-15tons
  • Certification: CE ISO9001
  • Warranty: 1 Year
  • After-sales Service Provided: Engineers available to service machinery overseas
  • crusher blade: skd11
  • steel material: sus 304
  • Drying way: vertical centrifugal

Packaging & Delivery

Packaging Details Film and board packing as standard shippment requirement .
Port Shanghai port

 

 

   Series Rigid pp pe plastic washing recycling lines 

 

1. Brief Introduction 

 

The Rigid pp pe washing recycling line  is made of stainless steel 304 , each part is made in strict quality control , with stable and low noise of the crusher, stable and low noise for other rotation parts,  rotation parts with strong structure ,safe and with longer working life .

 

2. Models and Parameters and Price ( Standard design)

 

ModelSC300SC500SC1000
Belt converyor1.5kw2.2kw2.2kw*2
Crusher22kw45kw45kw*2
Screw type friction loader5.5kw7.5kw7.5kw*2
Floating washing tank1.0*4.5m1.5*5.9m1.8*8m
Screw loader2.2kw3kw5.5kw
high speed friction machine22kw30kw37kw
Screw loader2.2kw3kw5.5kw
Plastic film squeezer ( separately)7.5kw11kw15kw
Capacity300kg/h500kg/h1000kg/h

 

3. Some photos of the production line :

 

 

 

 

4.Payment terms,delivery time and others

 

a.Term of payment

 

30% as advance payment by T/T after signing contract;

70% at advice goods ready by T/T before delivery.

 

b. Delivery time:45 days since receive down payment

 

c. Packing

 

Machine: Wood pallet covered by plastic film

 

d. Technical documents

 

We will offer you all necessary documents, e.g. general layout plan, water scheme, electrical diagram and user manual after the contract is executed.

 

e.Arrangement for inspection, installation and testing work

 

      After informed machines ready for inspection, customer can send engineers to our factory. Customer can also consign us to finish inspection work.

      After the machines are delivered to customer’s factory, please arrange preparation work for installation

      We will send technicians to the factory after preparation work is completed;

      Technicians will be responsible for guide on-site installation and testing machines

      Meanwhile technicians will give free training lessons to labors in customer’s factory.

      The customer just needs to bear expenses generated for this work, e.g. airplane tickets (round-way), residency, meals and allowance of70D per day for each technician.

 

f.Quantity and quality guarantee

 

      Quantity/Quality Discrepancy to destination port during transportation:

In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the goods at port of destination. We will not be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office.

      Guarantee period and after-sales services: 12months since installation finish and running.

      Long-term service:

We will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.

g. Period of validity

Above quotation is valid within one month since quote date

 

Thanks for cooperation! 

 

 

 

China (Mainland) | Trading Company
The supplier supports Trade Assurance – A free service that protects your orders from payment to delivery.
Supplier's Trade Assurance Limit:
Learn More